December 6, 2003 . . .
The roof is shingled.
I think it's time to order that dumpster.
December 19, 2003 . . .
The front door is installed and hanging the siding has begun.
Inside the house, the electrical wiring is being installed . . . . .
. . . as well as the HVAC ductwork.
Heeere's All-Purpose Larry .. a true stud among studs.
December 21, 2003 . . .
The vent pipes for the wood stoves are installed.
January 8, 2004 . . .
The electrical panel is put in.
So is the furnace . . .
. . . and the wall insulation.
Future location of the window air conditioner.  The window was missed only slightly.
The interior walls and ceiling of the screened deck are cladded.
A few HVAC parts are left over.  Although this is the future location of our kitchen table, it doesn't look like it will be dinnertime soon.
No time like the present.  Beginning to move some stuff into the basement.
Now, here's some creative studwork.  Turns out an in-wall HVAC vent would have emptied into a bathroom cabinet.  A solution was found.
Roofing, Siding, Electrical, HVAC